Client: Nikolay Tomov
Location: 8 Bragato Place, Chatswood, Auckland 0626
Scope: Crystalline waterproofing of a construction block, including surface preparation and the application of two coats of crystalline waterproofing products.
FlooringPro was tasked with applying a crystalline waterproofing system at a construction site in Chatswood, Auckland. The project involved grinding the concrete block to remove old coatings and contamination before applying two coats of crystalline waterproofing. The work was conducted under challenging conditions, with multiple contractors on site and a tight timeline. Dust control was a major concern, which was mitigated using grinders with dust coating systems.
The crystalline waterproofing project at 8 Bragato Place, Chatswood, was successfully completed within a tight timeline, despite the challenges posed by the active construction site. FlooringPro’s use of dust control systems and precise coordination with other contractors ensured that the waterproofing work was completed efficiently and without disrupting the overall construction process. The application of two coats of crystalline waterproofing products provided the site with durable, long-lasting protection, meeting the client’s expectations.